Red Deer WAste Water Treatment Plant

CLIENT City of Red Deer
LOCATION Red Deer, AB
SIZE 640m2
COMPLETION 2002

GEC Architecture completed the needs analysis and conceptual design study to upgrade the existing wastewater treatment plant in Red Deer. Upon completion of the study, GEC was retained as prime consultant for the detailed design of a new stand-alone control building and site works for the City of Red Deer on the existing site.

The new control building is a highly customized, mixed use facility and is comprised of the following :

  • A laboratory for testing and analysis,
  • Locker and decontamination rooms,
  • Administration spaces,
  • Lunchroom. 

The Administration and Operations Building replaced existing facilities contained in the Headworks building and other locations in the Plant.